5.1 Before initial start-up
Pos: 42.8 /BA/Er stinbetriebnahme/Rundba llenpresse/Vorber eitungen Erstinbe triebnahme @ 226\mod_13926 43174796_78.doc x @ 1824323 @ @ 1
For reasons related to transport, the machine is delivered without the PTO shaft and bale
ejector. Before initial start-up, the machine must be completely assembled and adjusted to the
tractor type.
The following parts are included loose with delivery in some cases.
Pos: 42.9 /BA/Er stinbetriebnahme/Rundba llenpresse/Tei le Erstinbetriebnah me_Comprima CF/CV @ 298\mod_1 412840255658_78.doc x @ 2337402 @ @ 1
CP100050_3
4
2
3
1
5
6
7
Fig. 22
Pos. Designation Storage location
1 Can of spray paint Twine box
2 Universal shaft Wrapping table
3 Universal shaft support Twine box
4 Hose support and cable support Bale chamber
5 Fastening material Twine box
6 Power supply on the tractor Twine box
7 Universal shaft bracket for Comprima CV 210 Twine box
without fig. Control unit (depending on the version) Twine box
without fig. Extension cable Twine box
without fig. Ring spanner 13 Twine box