Commissioning
58
Pos: 42.11 /BA/Er stinbetriebnahme/Rundba llenpresse/Arbei tsschritte Ersti nbetriebnahme CF_CV @ 66\ mod_1302003384346_78. docx @ 593295 @ @ 1
KR201220
Fig.23
• Park the machine on firm, level ground.
• Place two wheel chocks (1) under the wheels to prevent the machine from rolling away.
1
VP800016
Fig.24
• Take the bag with the small parts (1) out of the twine box.
RBV01170
1
2
3
Fig.25
• Depressurise the tractor hydraulics.
• Connect the hydraulic hoses (1), (2) and (3) to the tractor hydraulics according to colour
coding.
Pos: 42.12 /Layout Module /---------------Seitenumbruch---------------- @ 0\mod_1196175311226_0. docx @ 4165 @ @ 1