EasyManua.ls Logo

Renault Duster 2007 - Page 280

Renault Duster 2007
1162 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
16A-10
STARTING - CHARGING
Starter: Removal - Refitting
K4M
16A
REMOVAL
I - REMOVAL PREPARATION OPERATION
a Position the vehicle on a two-post lift (see Vehicle:
Towing and lifting) (02A, Lifting equipment).
a Disconnect the battery (see Battery: Removal - Re-
fitting) (80A, Battery).
a Remove the air resonator (see 12A, Fuel mixture,
Air resonator: Removal - Refitting, page 12A-2) .
a Unclip:
-the gear control cables on the gearbox at (3) using
a screwdriver,
- the gearbox control cable sleeve stops by pressing
at (4) .
Tightening torquesm
starter bolts 44 N.m
starter lead nut 8 N.m
nut on the starter sole-
noid lead
5 N.m
JR5
118882
109149

Table of Contents

Related product manuals