442703/B
155
•Makesurethattheinstallationdoesnotcauseproblemswithexistingcabling,
ventilationducts,piping,etc.Bothsidesofthebulkheadmustbefree.
•Makesurethatenoughspaceismadeavailableformaintenancepurposes.
•Makesurethatadequateventilationisavailabletoavoidoverheating.
•Makesurethattheinstallationmethodallowsforthephysicalvibration,
movementsandforcesnormallyexperiencedonavessel.
3Makesurethatthechosenlocationmeetstheinstallationrequirements.
4Removethetwomountingbracketswhicharefastenedtotheshockabsorbers
ontheTransceiverUnit.
AnAllenkeyisprovidedforthispurpose.Itislocatedintheplasticbagfastenedto
theuppershockabsorber.
5Weldthemountingbracketssecurelytothebulkheadasshownintheillustrations.
6UseachainfallorsimilardevicetolifttheTransceiverUnitintoposition.
7Boltthecabinettothemountingbrackets.
Eightboltsareprovidedforthispurpose.
8ConnectthegroundingcablefromtheTransceiverUnittothemountingbracket.
9Donot
connectanyothercables.Thiswillbedonelaterintheinstallationprocess.
Relatedtopics
InstallingtheTransceiverUnit,page153
Cablelayoutandinterconnections,page159
Technicalspecications,page388
381457TransceiverUnitdimensions,page421
InstallingtheST90hardwareunits