EasyManua.ls Logo

Toyota 22R-E - Check Valve Timing; Install No.2 Timing Belt Cover

Toyota 22R-E
625 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
(e) Using the two water outlet nuts, install the two stud
bolts.
(f) Connect the four clamps on the high–tension cords
to the mounting bolts of the No.2 timing belt cover.
(b) Check that each pulley aligns with the timing marks as
shown in the illustration.
If the timing marks do not align, remove the timing
belt and reinstall it.
14. CHECK VALVE TIMING
(a) Slowly turn the crankshaft pulley two revolutions
from TDC to TDC.
NOTICE: Always turn the crankshaft pulley clockwise.
15. INSTALL NO.2 TIMING BELT COVER
(a) Install the gasket to the No.2 idler pulley.
(b) Install the gasket to the fan bracket.
(c) Install the gasket to the timing belt cover.
(d) Install the timing belt cover with the eleven bolts.
ENGINE ENGINE MECHANICAL
EG2–46

Table of Contents

Related product manuals