(b) Connect the following connectors:
• Injector connectors
• RH ground strap
• ECT sender gauge connector
• ECT sensor connector
• No.2 ECT switch connector
• Cold start injector time switch connector
• Knock sensor connector
22. INSTALL NO.2 AND NO.3 FUEL PIPES
(a) Install the No.2 fuel pipe with four new gaskets and
two union bolts.
Torque: 34 N–m (350 kgf–cm, 25 ft–lbf)
(b) Install the No.3 fuel pipe with four new gaskets and
two union bolts.
Torque: 34 N–m (350 kgf–cm, 25 ft–lbf)
24. INSTALL AIR INTAKE CHAMBER
(a) Install a new gasket and the intake chamber with the
six bolts and two nuts. .
Torque: 18 N–m (185 kgf–cm, 13 ft–lbf)
23. INSTALL ENGINE WIRE
(a) Install the engine wire with the two bolts.
21. INSTALL NO.4 TIMING BELT COVER
Install the timing belt cover with the four bolts.
Torque: 8.3 N–m (85 kgf–em, 74 in.–Ibf)
–ENGINE ENGINE MECHANICAL
EG2–84