4. CONNECT HIGH–TENSION CORDS TO
DISTRIBUTOR CAP
(a) Aline the spline of the distributor cap with the spline
groove of the holder, then slide the holder with the
grommet onto the distributor cap.
(c) Insert the distributor, aligning the groove of the dis–
tributor housing with the groove on the No.4 cam–
shaft bearing cap.
(b) Check that the lock claw of the holder is engaged by
lightly pulling the holder.
5. CONNECT DISTRIBUTOR CONNECTOR
NOTICE: Check that the holder is correctly installed to
the grommet and distributor cap as shown in the illus–
tration.
(d) Lightly tighten the hold–down bolt.
3. INSTALL DUST PROOF PACKING AND
DISTRIBUTOR CAP
–IGNITION SYSTEM (3VZ– E)
IG–26