(k) Connect the cold start injector tube with two new
gasket and the union bolt.
Torque: 15 N–m (150 kgf–cm, 11 ft–lbf)
(l) Connect the vacuum hose to the gas filter.
(m) Connect the cold start injector connector.
(n) Install the No.5 water by–pass hose to the water by
–pass pipe.
(o) Connect the No.4 water by–pass hose to the union of
intake manifold.
(j) Install No.1 engine hanger.
Torque: 40 N–m (410 kgf–cm, 30 ft–lbf)
(p) Connect the PCV hose to the union.
–ENGINE ENGINE MECHANICAL
EG2–86