Control system
U-11
Blowe motor removal/installation
1. disconnect the negative battery cable.
2. remove in order as shown in the table.
3. install in reverse order as of removal.
1 Connector
2 Front blower motor
Blower motor inspection
1. disconnect blower motor connector.
2. connect terminal b of front blower motor to
ground; connect motor terminal to battery
positive voltage. Inspect operation of motor. If
specified requirement is not met, replace the
front blower motor.
Electromagnetic clutch disassembly/assembly
1. disassemble in order as shown in the table.
2. assemble in reverse order as of disassembly.
3. adjust the electromagnetic clutch clearance.
1 Bolt
2 Pressure plate
3 Flexible snap ring
4 A/c compressor pulley
5 Screw
6 Clip
7 Screw
8 Coil