Operation
Bunker
324 / 564
3. Fold bunker bars and the front bunker wall in. (See Page 313)
4. Fold elevator, all side and rear bunker grids in. (See Page 309)
The bunker is completely folded in transport position.
– Check visually if the machine is really in the transport position.
– Clean the machine so, that all lighting and warning devices are visible, the allowed
total weight is not exceeded and pollution of public roads is avoided.