Lubrication schedule for RR 6-row lifter
535 / 564
9.3 Lubrication schedule for RR 6-row lifter
Lubricating point Number of
nipples
Every
oper. hrs.
Defoliator
Scalper bearings, per row 7 50
Fold leaf-spreader rotation point 2 100
Lever mechanism leaf-spreader folding 3 200
Defoliator wheels locking lever (not RBSO) 2 200
Cylinder scalper up/down (not with RES) 2 200
Cylinder rubber-defoliator inclination (only RES) 4 200
Rotat. point housing RES middle outside (only RES) 2 200
Lifter
Teeth flange shaking share gears (only with RR-V)* 5 50
Tilting frame single-row adjustment, per row 2 100
Cylinder shaft movement height adjustment 2 200
Rollers movement adjusting spindles 2 200
Lifter side shift rod ends cylinder 2 200
Rollers movement side shift rod ends cylinder 2 200
Depth-control roller gear RR 6-row cover outside 2 100
Remaining beet path
Angle gear elevator belt cover pipe right/bottom 1 100
Counter bearing elevator drive shafts 2 100
Counter bearing bunker auger 1 100
Knuckle joint bunker auger drive 1 100
Long conveyor drive shaft bearing 3 100
Cross conveyor drive shaft bearing 3 100
Conveyors guide wheels on the chain tensioner 8 100
Bearing cleaning roller 2 100
Bearing drive shaft unload conveyor 2 100
Unload conveyor pivot up/down front 1 200
Rod ends cylinder unload conveyor up/down 4 200
Rod ends cylinder bend unload conveyor 4 200
Rotating points of unload conveyor articulation parts 4 200