EasyManua.ls Logo

ROPA Tiger 6 - Retensioning Longitudinal Conveyor

ROPA Tiger 6
564 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance and Service
Bunker
457 / 564
7.14.3.2 Retensioning longitudinal conveyor
The both longitudinal conveyors are tensioned in the front. They must be separately
retensioned. The two tightening bolts of each conveyor are located at the front, at the
conveyor turn around under the bunker floor.
1
2
(1) Tensioning bolt
(2) Lock nut
For retensioning:
Loosen lock nuts (2).
By screwing in the tensioning bolts (1), slide the conveyor guide roller forward until
the rear conveyor chains enter the guide bars again cleanly.
Ensure that you adjust both tightening bolts (1) by the same distance each.
Retighten lock nuts.

Table of Contents