Operation
Bunker unloading
332 / 564
(49) STOP bunker unloading
Pressing this key stops unloading of the bunker and switches unload conveyor and
all conveyors abruptly off. The speed of the bunker unloading, which is active when
pressing the key , is saved (see description of the key (46)).
(45) Rotary wheel
You can continuously control the bunker unloading speed (unload conveyor + convey-
ors) using the rotary wheel (45).
ADVICE
The speed of the conveyors is coupled to the speed of unload conveyor. If the unload
conveyor speed is changed with this rotary wheel, the speed of the conveyor also
changes when switching conveyors unloading stages 2 to 5.
(46) Bunker unloading +
With this key you can change the stage of bunker unloading from 0 to 5 gradually.
If the bunker unloading is started by pressing once the key (46), the unload con-
veyor can be continuously adjusted from 0 to max. with the rotary wheel (45) (unload-
ing stage 0 flashes).
If the bunker unloading is started by pressing twice the key (46), then the bunker
unloading starts with the saved speed of the last unloading process.
(47) Bunker unloading -
With this key you can change the stage of bunker unloading from 5 to 0 gradually.
(48) Automatic bunker unloading at beet pile
By pressing this key you activate the automatic bunker unloading. During this process
the system switches to stages 1 → 2 → 4 → 5 of bunker unloading without any further
actions of the driver. The unloading speed can be changed at the rotary wheel (45).
You can also influence the activation of unload stage 4 (longitudinal conveyor starts).
Here the standard setting is the value 5, if you want a subsequent activation of the
unloading stage 4, turn the value higher.
Bunker
Bunker auger delay (sec)
Unloading engine rpm pile
Unloading engine rpm lifting
Unloading stage 2 speed %
Start delay unloading stage 4
Unload conveyor lag (sec)
Leaf-spreader speed by overload
5
2
5
50
1300
5
850
3