Cordex®CXCHPControllerSoftwareManual|7-Invertersystems
configurationandthephaseangle.Thecommissionwizardstepstheuserthroughtheprocess.Oncethis
iscomplete,therewillbeoneinverter(perphase)inthesystem.
Important: Follow all wizard instructions: If a mistake is made during commissioning or the wizard
encounters an error, commissioning must start over.
Commissioning may take several minutes to complete. This process is complex due to several
factors:
1.
ThetypeofACinputsourceconnectionisunknown.TheACinputsourcemaybeconnectedas
singlephase,splitphase,2-pole,orthreephase.Thecontrolleridentifiesthecorrectconfiguration
oftheACinputandconfigurestheT2Sinvertercontrolleraccordingly.
2. Forthreephaseandsplitphaseconnection,theACphaserotationisunknown.Thismeansthatif
phase1isassumedtohaveaphaseangleof0degrees,phase2mayhaveaphaseangleof120
degreesor240degrees.Thecontrollerwillidentifythecorrectphaserotation.
3. TheinverterstaketimetosynchronizetotheACinput.Asthecontrollerprobesallpossible
combinationstheinverterstakeatleast30secondsaftereachcombinationbeforedeterminingif
theyhavesynchronizedtotheACinput.
OncethecorrectACinputconnectionandthephaseanglehavebeendetermined,theT2Sinverter
controllerisconfiguredcorrectlytoacceptmoreinverters.
Adding inverters
Thethirdstageofcommissioninginvolvesinsertingtherestoftheinverters.Thisprocesstakestime.Itis
recommendedthatyoufollowalltheinstructionswithinthewizard.
Whenaninverterisinserted,itlearnsitspowerconfigurationfromtheinvertersalreadyinsertedinthat
phase.Thecontrollersetsthevaluesforthefollowing:
ACinputgroup
DCinputgroup
ThelocationinformationofbayID,slotID,andshelfID
Thecorrectphasenumberandphaseshift.
Afterallinvertersareinsertedintotheshelves,thefinalstepistoconfiguretheT2Sinvertercontroller
withtheparametersforthenumberofmodulesperphase,andthenumberofredundantmodulesin
eachphase.Thisinformationisimportantforthecorrectoperationofalarmsassociatedwithredundancy,
missinginvertersorsystemoverload.
Important: After configuring and commissioning is successful, make a backup of the system from
the LCD via the Shortcuts > Backup menu. This allows the system configuration to be restored
in the event of a controller replacement.
0350058-J0 Rev AL Page 109

Table of Contents

Other manuals for EnerSys Alpha Cordex CXC HP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EnerSys Alpha Cordex CXC HP and is the answer not in the manual?

EnerSys Alpha Cordex CXC HP Specifications

General IconGeneral
BrandEnerSys
ModelAlpha Cordex CXC HP
CategoryController
LanguageEnglish