Cordex®CXCHPControllerSoftwareManual|8-Linepowersystems
Toassignmultiplechannelstothesamelinepowerload,ausermayenterthesameLoad Name foreach
respectivechannel.
4. After the required information has been filled in
Aftermodificationofthefileandsavingit.Followsection'ImportaLinePowerChannelsFile'forguidance
onimportingthefile.
8.8.4. Import a line power channels file
Notice: If there are line power loads and channels that already exist on the line power system,
then it is always recommended to export those channels as a backup just in case the system
configuration needs to be reverted. Go to Systems > Line Power System > Inventory > Line
Power Channels and pressing the Export Channel Details button. The exported file then can be
re-imported later to return to that configuration if required.
AftermodifyingthelinepowerchannelsCSVfile,gotoSystems > Line Power System > Inventory >
Line Power Channels andselecttheImport configuration from CSV button.Uponsuccessfulimport,
verifythatthesystemconfigurationiscorrectbasedontheimportedCSVfile.
Followthefollowingsections:(1)'VerifyaLinePowerChannelImport'fortipsonvalidatinganimported
CSVfileand(2)'LinePowerChannelsFileImportErrors'totroubleshooterrorsthatmayhavebeen
encounteredontheimportprocess.
8.8.5. Verify a line power channel import
Afterasuccessfulimport,itisalwaysrecommendedtocheckagainstthefileimportedtowhatnowexists
onthesystem.
Line power channels and loads
InSystems > Line Power System > Inventory > Line Power Channels table.Thevaluesinthistable
willbefilledbasedontheimportedCSVfilewitheachchannelassignedtoanexpectedlinepower
load.ThistablecanbeusedtoverifythevaluesenteredintheCSVfilematchtheexpectedsystem
configuration.
Additionally,theSystems > Line Power System > Inventory > Line Power Loads tablecanbeusedto
checkthelinepowerloadscreatedandthenumberofchannelsassignedarecorrect.
Line power layout page
AsecondarywaytoverifyanimportedCSVfileistogototheSystems > Line Power System > Layout
page.Thispageservesasaall-in-onepagetodisplaythephysicallayoutofalinepowersystem.
AdditionalinformationabouttheLine Power Layout pagecanbefoundinthesectiondetailedLine
PowerSystemLayout.
0350058-J0 Rev AL Page 123

Table of Contents

Other manuals for EnerSys Alpha Cordex CXC HP

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the EnerSys Alpha Cordex CXC HP and is the answer not in the manual?

EnerSys Alpha Cordex CXC HP Specifications

General IconGeneral
BrandEnerSys
ModelAlpha Cordex CXC HP
CategoryController
LanguageEnglish