EasyManua.ls Logo

Fujitsu PRIMERGY RX300 S7 - Concluding Steps; Removing 2.5-Inch HDD; SSD Modules; Required Tools; Preliminary Steps

Fujitsu PRIMERGY RX300 S7
560 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
154 Upgrade and Maintenance Manual
RX300 S7
Hard disk drives / solid state drives
Ê Insert the HDD module into a drive bay and carefully push back as far as it
will go (1).
Ê Close the locking lever to lock the hard disk drive in place (2).
7.3.2.5 Concluding steps
Perform the following procedures:
Ê "Performing a RAID array rebuild" on page 108
Ê "Closing the rack door" on page 84
7.3.3 Removing 2.5-inch HDD / SSD modules
7.3.3.1 Required tools
Preliminary and concluding steps: tool-less
Removing a 2.5-inch HDD / SSD module: tool-less
7.3.3.2 Preliminary steps
Perform the following procedures:
Ê Ensure that the HDD / SSD module to be removed is not combined into a
RAID array. If the drive is part of a RAID array, you first need to delete the
array using ServerView RAID Manager.
V CAUTION!
All data on all HDDs / SSDs in the array will be lost! Be sure to back
up your data before deleting a RAID array.
I For further information, please refer to the "ServerView Suite RAID
Management" user guide, available online at
http://manuals.ts.fujitsu.com.
Customer Replaceable Units (CRU)
Average task duration: 5 minutes

Table of Contents

Other manuals for Fujitsu PRIMERGY RX300 S7

Related product manuals