292 Upgrade and Maintenance Manual
RX300 S7
Processors
Ê "Removing the server cover" on page 72
Ê "Removing the air duct" on page 73.c
11.2.3 Installing the processor
11.2.3.1 Opening the load plate of the processor socket
I This description applies to the following procedures:
– Installing the second CPU in a mono-processor configuration
– Transfering a CPU after replacing the system board (see section
"Swapping processors" on page 495)
Figure 148: Opening socket release lever 1
Ê Unlatch the socket release lever marked Open 1st by pushing it down and
away from the socket (1).
Ê The socket release lever will slightly lift up (2).