EasyManua.ls Logo

Fujitsu PRIMERGY RX300 S7 - Installing Processors; Required Tools; Preliminary Steps

Fujitsu PRIMERGY RX300 S7
560 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
RX300 S7
Upgrade and Maintenance Manual 291
Processors
11.2 Installing processors
V CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.
11.2.1 Required tools
Preliminary and concluding steps: tool-less
Removing and installing the processor heat sink:
Phillips PH2 / (+) No. 2 screw driver
Installing the processor: tool-less
11.2.2 Preliminary steps
Perform the following procedures:
Ê "Disabling BitLocker functionality" on page 85
Ê "Disabling SVOM boot watchdog functionality" on page 86
Ê "Shutting down the server" on page 65
Ê "Disconnecting power cords" on page 66
Ê "Extending the server out of the rack" on page 69
If further required, remove the server from the rack as described in section
"Removing the server from the rack" on page 70.
Upgrade and Repair Units (URU)
Average hardware task duration: 15 minutes
Average software task duration: 5 minutes

Table of Contents

Other manuals for Fujitsu PRIMERGY RX300 S7

Related product manuals