300 Upgrade and Maintenance Manual
RX300 S7
Processors
Figure 156: Closing socket release lever 1
Ê Close the socket release lever marked Open 1st (1) and latch it under the
load plate retention tab (2).
Ê If applicable, install the second processor accordingly.
11.2.4 Concluding steps
Perform the following procedures:
Ê "Installing processor heat sinks" on page 325
Ê "Installing the air duct" on page 74
Ê "Mounting the server cover" on page 76
Ê "Sliding the server into the rack" on page 80
If the server has been completely removed from the rack for maintenance
purposes, reinstall and secure it in the rack as described in section
"Mounting the server cover" on page 76.
Ê Reconnect all external cables.