Installing HiPath 3000
P31003-H3560-S403-54-7620, 09/05
4-166 HiPath 3000 V6.0, HiPath 5000 V6.0, Provisional Service Manual
inst_h3.fm
Installing HiPath 3550, HiPath 3350, HiPath 3500, and HiPath 3300
4.4.2 Installation Procedure
Table 4-19 HiPath 3550, HiPath 3350, HiPath 3500 and HiPath 3300 - System Installation
Procedure
Step Installation Activity
Installing HiPath 3550 and HiPath
3350
Installing HiPath 3500 and HiPath
3300 (19-Inch Housing)
1. Selecting the Installation Site, page 4-
167
(usually predetermined)
Selecting the Installation Site, page 4-
189
(usually predetermined)
2. Unpacking the Components, page 4-
170
Unpacking the Components, page 4-
190
3. Not for U.S.: Mounting the Main Distribu-
tion Frame (HiPath 3550 only), page 4-
170
Not for U.S.: Attaching a HiPath 3500
and HiPath 3300 to the Wall, page 4-191
4. Removing the System Housing Cover,
page 4-172
Installing a HiPath 3500 or HiPath 3300
in a Cabinet, page 4-192
5. Attaching the System to the Wall, page
4-174
Grounding the System, page 4-194
6. Grounding the System and the Main
Distribution Frame, page 4-175
Installing the Boards, page 4-195
7. Installing the Boards, page 4-177 Connecting Cables and the Line Net-
work, page 4-196
8. Laying the Line Network and Connec-
tion Cables, page 4-178
Configuration notes, page 4-197
9. Attaching Ferrite, page 4-181 Connecting Workpoint Clients, page 4-
200
10. Configuration notes, page 4-183 Making trunk connections, page 4-200
11. Connecting Workpoint Clients, page 4-
187
Performing a Visual Inspection, page 4-
200
12. Making trunk connections, page 4-187
13. Performing a Visual Inspection, page 4-
187