LH 5000 controller setup 5 Implement application controller setup
LH 5000 controller setup
1. After you select LH 5000 as your controller, the Output Port screen displays.
2. Choose the port you want to configure.
3. Make sure the Output Port matches the port on the display that the controller is connected to
(COM or AUX).
4. Do not configure the display to output NMEA messages on the same port that your controller
is connected to.
For more information on configuring the LH 5000 controller, refer to the LH 5000 instruction manual.
Advanced
Use the Advanced option in the Implement screen to set up:
l Boom Setup
l Swath Control
l Rate Control
l Target Rate
l Turn Off Rate on Overlap
l Rate Snapping
Boom Setup
The boom setup on the display must match the setup on the LH 5000 controller. If the boom setup
on the display is different from that on the LH 5000 controller, a warning message displays.
Setting Explanation
Implement width Enter a width between 1' 00" - 328' 01" (0.30 - 99.99 m).
Fence Nozzles Enter the locations of any fence nozzles.
Number of sections Enter a number between 1 - 10.
Swath Control
Setting Explanation
Boom control Enter a width between 1' 00" - 328' 01" (0.30 - 99.99 m).
Version 7.0, Revision A CFX-750 Display User Guide 105