Configuring the Internal Baseband Source
R&S
®
SMW200A
271User Manual 1175.6632.02 ─ 30
Example:
●
"Data Source > External"
●
Modulation with 3 bits per symbol
●
"Symbol Clock Slope > Positive", i.e. the active edge of the symbol clock is the ris-
ing edge
●
Clock active edge falls at the center of the first bit of each symbol
Figure 5-13: Throughput delay (symbols indicated by different colors)
The throughput delay is the time between center points: The center of the modulation
symbol at the RF output and the center of the first bit in each symbol in the external
data.
Remote command:
[:SOURce<hw>]:BB:DM:SMODulation:THRoughput:DELay? on page 995
Graphical illustration of the timing ratios between the data and clock signals ←
Settings for Data Source = External
A graph illustrates the timing relation, depending on the selected:
●
Bit Clock Slope
●
Clock Input Slope
●
Bit Order
Connector Settings
Option: R&S SMW-B10
Accesses the connectors settings.
See also Chapter 12.2, "Configuring Local and Global Connectors", on page 714.
5.6.3.4 Modulation Settings
Access:
► Select "Baseband > Custom Digital Mod > Modulation".
This tab provides access to the modulation settings, e.g modulation type, FSK devia-
tion, or modulation depth. The dialog shows the theoretical constellation diagram of the
selected modulation.
Generating Custom Digital Modulated Signals