Note: The risers can be accessed only after removing the top cov
er over the
Controller chassis.
Note: To replace a riser, you do not need to remove the Controller from the rack
but extend it along the Controller rails using the cable management arm (CMA).
Note: Ensure that all power is removed from the Controller before replacing the
riser. Disconnect the power cords before performing the riser replacement
procedure.
Procedure Overview
1 Prepare the Component for Replacement
2 Slide Controller to Service Position
3 Remove the Controller Power Supply Cords
4 Disconnect Controller Cabling
5 Open the Controller Top Cover
6 Remove a Riser
7 Insert a Riser
8 Close the Controller Top Cover
9 Reconnect Controller Cabling
10 Complete the Component Replacement
11 Verify Controller Component Status
Related Links
Controller Components
Prepare the Component for Replacement
1 From Oracle FS System Manager (GUI), navigate to Support > System
Trouble.
2 Select the Controller that contains the component that is to be replaced.
3 Select Actions > Replace Component.
Guided Maintenance displays the list of replaceable components for the
Controller.
Note: Field replaceable units (FRUs) can only be replaced by eld
technicians with support role privileges.
4 Select a component from the list.
5 Click Next.
Guided Maintenance displays the Identify Hardware dialog.
6 From the Identify Hardware dialog, specify how you want to identify the
chassis so that you can locate it in the data center.
Controller Replacement Procedures