EasyManua.ls Logo

Oracle FS1-2

Oracle FS1-2
268 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
standby Pilot.
After the active Pilot is oine, the GUI closes. When
the failover is complete, you can log back into the GUI.
If you are replacing a component located on the standby Pilot,
Guided Maintenance brings the standby Pilot oine. When
servicing the standby Pilot, failover is not required.
If you are replacing a power supply or a fan module, you are not
required to bring the Pilot oine. The power supplies and fan
modules are hot-serviceable.
Note: You can replace one power supply without bringing the Pilot
oine, as long as the second power supply remains online and
operational.
Slide Pilot to Service Position
1 Extend the rack’s anti-tilt legs.
Figure 179: Pilot position during component replacement
Legend
1 Rack
2 Pilot chassis
3 Pilot rails
2 Slide the Pilot chassis fully forward until the slide lockout release tabs lock
into position.
Pilot Replacement Procedures
215

Table of Contents

Other manuals for Oracle FS1-2

Related product manuals