EasyManua.ls Logo

Dodge Sprinter 2006 - Page 1608

Dodge Sprinter 2006
2315 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
CAUTION: Do not drive cup plug into the casting as
restricted cooling can result and cause serious
engine problems.
Thorou ghly clean inside of cup plug hole in cylin-
der block or hea d. Be sur e to rem ove old sealer.
Lightly coa t inside of cup plu g hole with Mopar!
St ud an d Bearing Moun t. Make cer tain the new plu g
is clea ned of all oil or grea se. Using proper drive
plug, drive plu g into hole so tha t t he sharp edge of
the plug is at least 0.5 mm (0.020 in .) inside th e
lead-in cham fer.
It is not necessar y to wait for curing of the sealant.
The cooling system can be refilled and the vehicle
placed in service immediately.
STANDARD PROCEDURE - MEASURING CYLIN-
DER BORES
NOTE: This must be done with engine completely
disassembled.
(1) Thorou ghly clean all cylinder bores with appro-
pr iate cleaning solvent.
(2) Measur e each cylin der at the three measuring
points shown (Fig. 31).
(3) Usin g the t hree measurment poin t, mea su re
cylinder in t he longitu dinal a nd in the t ransverse
direct ion (Fig. 31).
Fig. 30 CORE HOLE PLUG REMOVAL
1 - CYLINDER BLOCK
2 - REMOVE PLUG WITH PLIERS
3 - STRIKE HERE WITH HAMMER
4 - DRIFT PUNCH
5 - CUP PLUG
9 - 38 ENGINE VA

Table of Contents

Related product manuals