(9) In st all insert #9312ā6 on riveting t ool and
secure with screw (Fig. 88).
(10) Install insert 9312ā8 on r ivet ing tool.
NOTE: The outer plate is held magnetically by rivet-
ing tool.
(11) In sert new outer plat e into the m ovin g assem -
bly in ser t .
(12) Posit ion riveting t ool so that spacer webs of
the guide are side by side (Fig. 88).
(13) Ensure that rivet ed link an d outer plate ar e
aligned.
NOTE: When turning spindle of riveting tool, be
sure that pins of riveted link are inserted into holes
of outer plate
(14) Screw in spin dle of r ivet ing tool u ntil firm
resistance is felt (Fig. 88).
(15) Remove rivet ing tool.
(16) Install movin g assembly inser t #9312ā1 1 to
#9312ā1.
(17) Posit ion r ivet ing t ool exactly over m iddle of
pin.
(18) Tighten riveting tool spindle to en d of t ravel
(Fig. 89).
(19) Repeat procedure for both riveting pin s (Fig.
89).
(20) Inspect r ivetin g, re-r ivet if required (Fig.
90).
(21) Install cylinder head cover (Refer to 9 -
ENGINE/CYLINDER HEAD/CYLINDER HEAD
COVER(S) - INSTALLATION).
(22) Install en gin e cover (Refer to9-ENGINE-
INSTALLATION).
(23) Connect n egat ive batt ery cable.
(24) Star t engine and inspect for leaks. Care must
be ta ken to observe the fuel system warn ing (Refer to
14 - FUEL SYSTEM - WARNING).
Fig. 88 OUTER PLATE INSTALLATION
1 - SPECIAL TOOL #9312-1
2 - THRUST SPINDLE #9312-4
3 - TOOL INSERT #9312-8
4 - TOOL INSERT #9312-6
Fig. 89 RIVETING THE LINK PINS
1 - SPECIAL TOOL #9312-1
2 - THRUST SPINDLE
3 - RIVETING PROFILE
4 - INSERT 9312-6
Fig. 90 RIVET INSPECTION
9 - 80 ENGINE VA