EasyManua.ls Logo

Dodge Sprinter 2006 - Page 1769

Dodge Sprinter 2006
2315 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Shift Phase - 2-1 Shift Phase 1
The 1-2/4-5 sh ift solenoid (1) (F ig. 20) is tu rned ON
to apply shift pressu re (p-S) to the end face of th e
1-2/4-5 comm and valve (5). This allows th e comman d
valve to up-shift an d the shift pressure com ing from
the 1-2/4-5 shift valve (3) is routed to the holding
clutch B1 (7) via the command valve.
Fig. 20 Shift Phase - 2-1 Shift Phase 1
1 - 1-2/4-5 SHIFT SOLENOID 5 - 1-2/4-5 COMMAND VALVE
2 - 1-2/4-5 OVERLAP VALVE 6 - DRIVING CLUTCH K1
3 - 1-2/4-5 SHIFT PRESSURE SHIFT VALVE 7 - HOLDING CLUTCH B1
4 - 1-2/4-5 HOLDING PRESSURE SHIFT VALVE 8 - SHIFT PRESSURE REGULATOR VALVE
VA AUTOMATIC TRANSMISSION NAG1 - SERVICE INFORMATION 21 - 31

Table of Contents

Related product manuals