Ve r i f i c a t i o n Te s t s
NAG1 TRANSMISSION VERIFICATION TEST - VER 1 APPLICABILITY
1. Recon n ect a ny disconn ect ed com pon ent s.
2. Con n ect t he DRBIII# t o th e Da t a Lin k Con n ect or.
3. Wit h th e DRBIII#, er a se ABS DTCs.
4. Wit h th e DRBIII#,eraseECMDTCs.
5. Wit h th e DRBIII#, er a se Tra n sm ission DTCs.
6. Wit h th e DRBIII#, displa y Tr a n sm ission Tem per a t u r e. St a rt a n d ru n th e en gin e un t il t h e
Tra n sm ission Temper a t u r e is H OT, a bove 43° C (110° F ).
7. Check t h e Tr a n sm ission flu id an d adju st if necessa r y. Refer to t h e Ser vice In form a t ion for t h e
pr oper Flu id F ill pr ocedu r e.
8. NOTE: If in te rn al re pairs w e re pe rform e d a nd th e sh ift qu ality is still p oo r, it ma y
be n e c e s s a ry to c h e c k th e in te rn a l re p a ir. Als o c h e c k fo r a n y TS B s a n d /o r Co n t ro lle r
Fla s h u pd a te s th a t m a y ap p ly.
9. ROAD TEST PROCE DURE
10. Roa d t est th e veh icle. Ma ke fift een t o t wen t y 1-2, 2-3, 3-4 an d 4-5 upsh ift s.
11. Per for m th ese sh ifts from a st a n din g st a r t t o 72 k m /h (45 MP H ) with a con st a n t t h r ot t le
open in g of 20 t o 25 degr ees.
12. Wit h speeds below 40 k m /h (25 MP H ), ma ke five t o eigh t wide open th r ot tle kickdown s t o
1st gea r. Allow at lea st 5 secon ds ea ch in 2n d a nd 3r d gea r bet ween ea ch kickdown .
13. Wit h th e DRBIII#, r ead Tr a n sm ission DTCs.
Wer e th er e an y Dia gn ost ic Trou ble Codes set ?
All
Ye s → Repa ir is n ot complet e, r efer to a ppropr ia t e sym pt om .
No → Repa ir is com plete.
127
VERIFICAT ION TEST S