700m
Unpacking Procedure 㐿ᚻ㗅ᦠ
MULTI-FUNCTION PRINTER ࡑ࡞࠴ࡈࠔࡦ࡚ࠢࠪࡦࡊࡦ࠲
(1) When this printer is installed in winter, if a printer that has been kept in
a cold warehouse is moved to a warm room and is unpacked, it may
cause several troubles since each part of the printer will be dewed.
In this case, leave the printer in the room for 6 hours or longer before
it is unpacked, then start installation work.
౻ቄߩ⸳⟎ߦ߅ߡޔୖᐶߥߤߢ▤ߐࠇߡߡ಄߃߈ߞߚᯏࠍᕆ
ߦᥦ߆ㇱደߦࠇࠆߣޔᯏౝㇱߦ⚿㔺ࠍ↢ߓߡ⒳ޘߩ࠻ࡉ࡞ߩ
ේ࿃ߣߥࠅ߹ߔޕߎߩࠃ߁ߥ႐วߪ㐿ߩ೨ߦ6ᤨ㑆એ⟎ߒޔච
ಽቶߦߥߓ߹ߖߡ߆ࠄ⸳⟎ᬺࠍ㐿ᆎߒߡߊߛߐޕ
NOTE / ᵈᗧ
NOTE / ᵈᗧ
Push Carefully. Casters should keep the center
of Slopes.
ࠠࡖࠬ࠲߇ࠬࡠࡊߩ߶߷ᄩࠍㅢࠆࠃ߁ߦࠁߞߊ
ࠅߣ㒠ࠈߒߡߊߛߐޕ
NOTE / ᵈᗧ
(2) Handle with great care when you unpack or install
the printer because its net weight is about 180Kg.
ᯏߩ㊀㊂ߪ⚂kgࠅ߹ߔߩߢޔᕋᚒ߿
ߩߥࠃ߁ߦ㐿⸳⟎ᬺߪᘕ㊀ߦㅴߡߊߛ
ߐޕ
(3) The printer package does not include printing paper.
So ask it separately before installing the printer.
ᯏᧄߩ൮ຠߦ↪⚕ߪ߹ࠇ߹ߖࠎޕ
⸳⟎ߩ೨ߦㅜߏ↪ᗧߊߛߐޕ
1. Cut the Bands (1), and then remove the Top Board (2).
ࡃࡦ࠼(1)ࠍಾᢿߒޔᄤ᧼(2)ࠍᄖߒ߹ߔޕ
13. Cut the tray (5) along the perforation lines for Slopes. Remove
excessive areas of the plastic sheet (3) / plastic bag (11) for ease
of subsequent operation.
(Note that Slopes are available on either side)
ޓ ࠬࡠࡊࠍขࠅઃߌࠆߚޔ࠻ࠗࠍࡒࠪࡦ⋡ߦวࠊߖߡࠞ࠶
࠻ߒ߹ߔޕߎߩ㓙ޔᯏࠍ㒠ࠈߒᤃߊߔࠆߚޔࡐࠪ࠻
߅ࠃ߮ࡐⴼߩಽߥಽ߽ࠞ࠶࠻ߒߡߊߛߐޕ
ࠬࡠࡊߪኻߦขࠅઃߌࠆߎߣ߽ߢ߈߹ߔޕ
9. Put 2 pieces each of Coaster (14: large) (15: small)
beneath Adjusters (17) and Casters (18).
Note that the Coarsters (14) (15) should be
located under the plastic bag (11).
ࠕࠫࡖࠬ࠲ߣࠠࡖࠬ࠲ߩߦ࿑ߩ
ࠃ߁ߦ⿷บࠍฦᨎߕߟ࠶࠻ߒ߹ߔޕ
ߎߩ㓙ޔ⿷บߪᯏࠍⷒߞߡߚ
ࡐⴼߩߦ࠶࠻ߒߡߊߛߐޕ
10. Turn the front / rear Adjusters (17) on one side
clockwise to lift up the machine, and remove the
pad (19). Do the same way for the pad (20).
(no paticular order of right / left)
ઃዻߩࠬࡄ࠽ߢޔ೨ޔᓟߩฦࠕࠫࡖࠬ࠲
ࠍᤨ⸘ᣇะߦ࿁ߒߡᯏࠍᜬߜߍޔࡄ࠶
࠼ࠍᄖߒ߹ߔޕหߓⷐ㗔ߢࡄ࠶࠼
߽ᄖߒ߹ߔޕ
ࡄ࠶࠼ࠍᄖߔ㗅⇟ߪ߹ߖࠎޕ
14. Attach Slopes to the tray (5) with the
double-sided tapes.
࠻ࠗߦޔࠬࡠࡊࠍ㕙
࠹ࡊߢขࠅઃߌ߹ߔޕ
15. Raise the tray (5) with Joints (6) removed on step 5.
ᚻ㗅ߢขࠅᄖߒߚ࡚ࠫࠗࡦ࠻ࠍ࠻ࠗߦขࠅ
ઃߌޔ࠻ࠗࠍ┙ߡ߹ߔޕ
16. Pull the machine by using Slopes until one side
comes down to the floor and stop.
ᯏࠍࠬࡠࡊߦᴪࠊߖߡᒁ߈㒠ࠈߒޔ ߩ
ࠠࡖࠬ࠲߇ᐥߦ⌕ߚࠄ৻ᣤᱛߒ߹ߔޕ
17. Last, push the machine to unload ot from the pallet.
ᦨᓟߪᯏࠍߒߡޔࡄ࠶࠻߆ࠄ㒠ࠈߒ߹ߔޕ
11. Turn Adjusters (17) counter-clockwise until
Casters (18) touch Coarsters (14).
ࠠࡖࠬ࠲߇⿷บߦធߔࠆ߹ߢࠕ
ࠫࡖࠬ࠲ࠍᤨ⸘ᣇะߦ࿁ߒ߹ߔޕ
12. After Casters touch Coarsters (14), remove
Coarsters (15).
ࠠࡖࠬ࠲߇⿷บߦធߒߚࠄޔ⿷บ
ࠍᄖߒ߹ߔޕ
2. Open the plastic sheet (3) on the outer packing.
ᄖⵝ▫ࠍⷒߞߡࠆࡐࠪ࠻ࠍ㐿߈߹ߔޕ
3. Remove Lid (4).
⬄ࠍᄖߒ߹ߔޕ
5. Remove 6 Joints (6).
6ߩ࡚ࠫࠗࡦ࠻ࠍᄖߒ߹ߔޕ
6. Remove Outer Cardboard Box (7) to remove
Side Pads(8).
ᄖⵝ▫ࠍᄖߒޔࠨࠗ࠼ࡄ࠶࠼ࠍᄖߒ߹ߔޕ
4. To open the Tray (5), make a cut on each corner.
࠻ࠗ྾㓈ߩ࠹ࡊࠍಾᢿߒޔ࠻ࠗࠍ㐿߈߹ߔޕ
2
1
Pull out
ᒁ߈ᛮߊ
Turn Left
Ꮐߦ࿁ߔ
6
5
7
7
8
8
3
1
2
6
4
Open
㐿ߊ
Open
㐿ߊ
৻ᣤᱛ
STOP HERE !
13
135
8 pieces each
ฦ8 ᨎ
15
14
8. Take out the Slope R/L (13), Coasters (14: Large) (15: small)
and the wrench (16) from the accessory box (12).
ઃዻຠ▫߆ࠄࠬࡠࡊߣ⿷บᄢޔ⿷บዊޔ
ࠬࡄ࠽ࠍขࠅߒ߹ߔޕ
7. Remove the Front Pad (9), Rear Pad (10). Open and draw down the plastic bag (11) to the bottom.
ࡈࡠࡦ࠻ࡄ࠶࠼ޔࠕࡄ࠶࠼ࠍᄖߒޔᯏࠍⷒߞߡࠆࡐⴼࠍ㐿߈ޔ߹ߢ㒠ࠈߒ߹ߔޕ
10
11
12
16
Cut
ಾࠆ
Cut
ಾࠆ
Cut
ಾࠆ
NEVER use a forklift to unload
the machine.
ᯏࠍࡄ࠶࠻߆ࠄ㒠ࠈߔ㓙ޔࡈࠜ
ࠢࡈ࠻ߪ↪ߒߥߢߊߛߐޕ
20
18
18
11
14
14
14
15
15
17
17
17
16
3
5
13
6
6
12
9
11
19
5