EasyManua.ls Logo

Rohde & Schwarz RTP044 - Self-Test

Rohde & Schwarz RTP044
2403 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Instrument setup
R&S
®
RTP
125User Manual 1337.9952.02 ─ 12
1. Warm up the instrument before you start the self-alignment. The minimum warm-up
time is indicated in the data sheet.
2. Remove the probes from the input connectors.
3. In the "Menu" > "Settings" menu, select "Maintenance".
4. In the "Alignment" tab, tap "Start Alignment".
The alignment is performed, the process might take several minutes. A message
box informs you about the running process, wait until this message box closes.
The overall pass/fail result is shown in the "Overall alignment state" field. The
results of the individual alignment steps for each input channel are indicated in the
"Results" tab. This information is required if problems arise.
4.7.3 Self-test
The instrument's self-test checks the hardware for correct operation. Perform the self-
test if you suspect problems in hardware operation.
Access: "Settings" >"Maintenance" > "Selftest"
The test can take several minutes. The summary result is shown in the "State" field,
which can be helpful in case you need support.
Selftest
Starts the self-test.
Remote command:
*TST? on page 1153
State
Shows the summary result of the self-test: Pass or Fail.
Remote command:
DIAGnostic:SERVice:STST:STATe? on page 1185
Result
Opens a log file with detailed information on the self-test steps and operation of hard-
ware components, which can be helpful in case you need support.
Maintenance settings

Table of Contents

Other manuals for Rohde & Schwarz RTP044

Related product manuals