The Cisco ASR 1004 Router needs adequate ventilation. Do not install it in an enclosed cabinet where
ventilation is inadequate.
•
Have the cable-management bracket available if you plan to install it on the front of the chassis.
•
An adequate chassis ground (earth) connection exists for your router chassis (see the Attaching a Chassis
Ground Connection, on page 201).
• Always follow proper lifting practices as outlined in the “Electrical Safety” section on page 5-21 , when
handling the chassis.
Equipment Shelf or Tabletop Installation
At least two people are required to lift the chassis onto a tabletop or platform. To prevent injury, keep
your back straight and lift with your legs, not your back. Statement 164
Note
Figure 62: Lifting the Chassis
The chassis in the image does not represent the Cisco ASR 1004 Router. This is only an example of how
to lift a Cisco chassis.
Note
Cisco ASR 1000 Series Router Hardware Installation Guide
188
Cisco ASR 1004 Router Overview and Installation
Equipment Shelf or Tabletop Installation