GE HEALTHCARERAFT LOGIQ™ S7 EXPERT/PRO
DIRECTION 5460683, REVISION 3 DRAFT (JUNE 25, 2014) SERVICE MANUAL
8-50 Section 8-12 - Replacement of Monitor and LCD Arm Plastic Covers
4.) Unscrew 2 screws, then separate the Monitor from the Monitor Stand Arm. Refer to the figure
below.
8-12-5 Monitor Installation Procedure
1.) Parts to be installed in reverse order of removal.
NOTE: When installing Monitor Cable Holder Bracket, be sure to assemble bracket with cable clamp as show
below.
Figure 8-36
Figure 8-35 Unscrewing 2 screws & separating the Monitor