EasyManua.ls Logo

GE LOGIQ S7 Pro - CHAPTER 3 Setup Instructions; Overview; The Purpose of Chapter 3; Set up Reminders

GE LOGIQ S7 Pro
435 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCAREDRAFT LOGIQ™ S7 EXPERT/PRO
DIRECTION 5460683, REVISION 3 DRAFT (JUNE 25, 2014) SERVICE MANUAL
Chapter 3 - Setup Instructions 3-1
Chapter 3
Setup Instructions
Section 3-1
Overview
3-1-1 The Purpose of Chapter 3
This chapter contains information needed to setup the LOGIQ™ S7 ultrasound system. Included are
procedures to receive, unpack and configure the equipment.
A worksheet is provided (see: page 3-58 to page 3-59) to help ensure that all the required information
is available, prior to setup the system.
Section 3-2
Set Up Reminders
3-2-1 Average Installation Time
Once the site has been prepared, the average installation time required is shown in Table 3-2 below.
Table 3-1 Contents in Chapter 3
Section Description Page Number
3-1
Overview
3-1
3-2
Set Up Reminders
3-1
3-3
Receiving and Unpacking the Equipment
3-4
3-5
Preparing for Set Up
3-8
3-6
Connection of Auxiliary Devices
3-10
3-7
Completing the Set Up
3-21
3-8
Printer Installation
3-30
3-9
System Configuration
3-39
3-10
Available Probes
3-43
3-11
Software/Option Configuration
3-46
3-12
Connectivity Setup
3-47
3-13
Configuring Connectivity
3-51
3-14
Connectivity Setup Worksheet
3-58
3-15
Paperwork
3-60
Table 3-2 Average Installation Time
Description Average Installation Time Comments
Unpacking the scanner 0.5 hours
Installing the scanner / options / printers 0.5 to 1.5 hours depends on required configuration
DICOM Option (connectivity) 0.5 - 1.5 hours depends on configuration amount

Table of Contents

Related product manuals