GE HEALTHCARERAFT LOGIQ™ S7 EXPERT/PRO
DIRECTION 5460683, REVISION 3 DRAFT (JUNE 25, 2014) SERVICE MANUAL
8-62 Section 8-13 - Replacement of OPIO and Related Parts
8-13-4 Installation Procedure
1.) Parts to be installed in reverse order of removal.
Note: Make sure to assemble “Rubber Sheet” securely to PWA
.
Figure 8-56 Installation of PWA
NOTE: In some cases, when OPIO is replaced the Windows base system may recognize new OPIO as ‘new’
hardware device.
This could bring Touch Panel graphics to top of main screen resulting to have only the wall paper (ping,
cherry blossom) without touch panel buttons.
When this occurs, go into Windows desktop, and double click “OPIO Position Reset” icon.
Alternatively, go to Windows graphics property manager, and bring SCREEN3 to below SCREEN1.
8-13-5 Functional Check
Test Refer to Note
System Exterior Visual Check Section 4-3-1 Control panel visual check only
Power On/Off Section 4-3-3
System Integration Checks Section 4-3-5 Section 4-3-5-1 OPIO Test only
OPIO Interface Check Section 4-3-8