GE HEALTHCARERAFT LOGIQ™ S7 EXPERT/PRO
DIRECTION 5460683, REVISION 3 DRAFT (JUNE 25, 2014) SERVICE MANUAL
3-6 Section 3-3 - Receiving and Unpacking the Equipment
3.
Remove the option box on front of the system..
4.
Remove the monitor pads from the both sides of the monitor and remove the 4 pads of the box bottom assy..
5.
Carefully remove foam packing material and plastic bag from the ultrasound unit and monitor.
Caution: Two people are needed in the next step due to the weight of the equipment.
Table 3-5 Unpacking Procedure
Step Task