INSTALLATION
(1) Remove the oil fill cap, clean t he oil ret urn pa s-
sa ge in th e cylinder hea d cover, th en blow out with
low pressu re compressed a ir.
(2) Clean mating surfaces.
(3) In st all the CCV br eath er and tighten fastener s
to 11 N·m (97 in.lbs.) (Fig. 3).
(4) Connect the CCV brea ther ou tlet hose (F ig. 3).
(5) In st all the engine cover (Refer to9-ENGINE-
INSTALLATION).
Fig. 3 CCV BREATHER
1 - FUEL RAIL 6 - CAM POSITION SENSOR
2 - FUEL RAIL PRESSURE SENSOR 7 - FUEL INJECTOR
3 - FUEL INJECTOR RETURN LINE 8 - HIGH PRESSURE FUEL INJECTOR SUPPLY LINE
4 - CCV BREATHER 9 - FUEL PRESSURE SOLENOID
5 - CYLINDER HEAD COVER 10 - FUEL RAIL SUPPLY LINE
VA EVAPORATIVE EMISSIONS 25 - 3