3 - 197
Chapter 3 Removal and Replacement Procedures (RRPs)
When installing the ACTUATOR FULL STACK to the Option OCT, combine it with the
SHAFT FULL STACK as shown in the figure.
2) Install the COVER OCT (PL 11.1). (RRP11.4)
3) Install the COVER REAR (PL 11.1). (RRP11.2)
After installation, when the FLAPPER L is moved with a finger, make sure that the ACTU-
ATOR FULL STACK moves together with the FLAPPER L. Also make sure that FLAP-
PER R operates smoothly.