EasyManuals Logo

Fujitsu PRIMERGY RX2540 M6 Upgrade And Maintenance Manual

Fujitsu PRIMERGY RX2540 M6
680 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #106 background imageLoading...
Page #106 background image
For more information on how to resume BitLocker drive encryption, see
the Microsoft TechNet library at:
https://technet.microsoft.com/library/cc731549.aspx
For more information, see the Fujitsu web pages.
5.3.12 Performing a RAID array rebuild
After replacing an HDD that has been combined into a RAID array, RAID
rebuild will be performed completely unattended as a background process.
â–¶
Ensure that the RAID array rebuild has started normally
. Wait until the
progress bar has reached at least one percent.
â–¶
Inform the customer about the remaining rebuild time, based on the
displayed duration estimate.
Figure 39: Progress bar (RAID array rebuild)
CAUTION
The system is now operational, however, data redundancy will not be
available until the RAID array rebuild is complete. Depending on the
HDD capacity the overall process can take up to several hours, in some
cases even days.
Basic software procedures
106 Upgrade and Maintenance Manual RX2540 M6

Table of Contents

Other manuals for Fujitsu PRIMERGY RX2540 M6

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY RX2540 M6 and is the answer not in the manual?

Fujitsu PRIMERGY RX2540 M6 Specifications

General IconGeneral
Memory Slots32 DIMM slots
Form Factor2U rack server
ProcessorIntel Xeon Scalable Processors (3rd generation)
StorageUp to 24 x 2.5" or 12 x 3.5" drives
RAID SupportRAID 0, 1, 5, 6, 10
Network4 x 1GbE ports (onboard), optional 10/25GbE
Power Supply800 W, 1200 W, 1600 W
Expansion SlotsUp to 8x PCIe Gen4 slots
Operating System SupportWindows Server, Red Hat Enterprise Linux, SUSE Linux Enterprise Server, VMware
ManagementiRMC S5

Related product manuals