Inform the system administrator that the server will be shut down and put
offline.
T
erminate all applications.
Perform the required procedures described in the preliminary steps of each
upgrade or maintenance task.
Shut down the server.
If the system is running an ACPI-compliant operating system (OS),
pressing the On/Off button will perform a graceful shutdown.
4.4 Disconnecting the power cord
4.4.1 Disconnecting the power cord (AC PSU)
Figure 4: Unlocking the cable clamp of a PSU
Press the cable clamp down until it disengages (1).
Open the cable clamp (2).
Basic hardware procedures
RX2540 M6 Upgrade and Maintenance Manual 53

Table of Contents

Other manuals for Fujitsu PRIMERGY RX2540 M6

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY RX2540 M6 and is the answer not in the manual?

Fujitsu PRIMERGY RX2540 M6 Specifications

General IconGeneral
Memory Slots32 DIMM slots
Form Factor2U rack server
ProcessorIntel Xeon Scalable Processors (3rd generation)
StorageUp to 24 x 2.5" or 12 x 3.5" drives
RAID SupportRAID 0, 1, 5, 6, 10
Network4 x 1GbE ports (onboard), optional 10/25GbE
Power Supply800 W, 1200 W, 1600 W
Expansion SlotsUp to 8x PCIe Gen4 slots