Concluding steps
▶
"Connecting the power cord" on page 65.
▶
"Switching on the server" on page
69.
▶
If applicable, "Installing the front cover with lock" on page 69.
▶
Configure the new MAC address in the OS, if you have no VIOM
(ServerView Virtual-IO Manager) installed. If you have VIOM installed, it is
not necessary to configure the MAC address. This is virtualized by VIOM.
▶
Inform the customer about new MAC addresses. For more information, see
"Looking for MAC/WWN/GUID and SAS addresses" on page 107.
▶
"Updating the NIC configuration file in a Linux and VMware environment" on
page 104.
▶
"Configuring LAN teaming" on page 113.
9.5.3 Removing an OCP module
Upgrade and Repair Unit
(URU)
Hardware: 5 minutes
Tools: tool-less
Preliminary steps
▶
If applicable, "Removing the front cover with lock" on page 52
.
▶
"Shutting down the server" on page 52.
▶
"Disconnecting the power cord" on page 53.
Expansion cards and backup units
252 Upgrade and Maintenance Manual RX2540 M6