Concluding steps
â–¶
"Reassembling" on page 60
.
â–¶
"Connecting the power cord" on page 65.
â–¶
"Switching on the server" on page 69.
â–¶
If applicable, "Installing the front cover with lock" on page 69.
â–¶
Update the system information of your server using the Chassis ID Prom
Tool, see "Using the Chassis ID Prom Tool" on page 110. Select the
corresponding system name.
â–¶
"Performing a RAID array rebuild" on page 106.
7.7.3 Upgrading with rear HDD cage 2
Field Replaceable Unit
(FRU)
Hardware: 10 minutes
Software: 10 minutes
Tools:
– Phillips PH2 / (+) No. 2 screw driver
–
Phillips PH1 / (+) No. 1 screw driver
CAUTION
All data on all HDDs/SSDs in the array will be lost when deleting the
RAID array!
â–¶
Be sure to back up your data before deleting a RAID array.
â–¶
For more information, see the "ServerView Suite RAID
Management" user guide.
After installing or removing an additional backplane, never forget to
change the system information using the Chassis ID Prom Tool.
Preliminary steps
â–¶
If applicable, "Removing the front cover with lock" on page 52
.
â–¶
"Shutting down the server" on page 52.
â–¶
"Disconnecting the power cord" on page 53.
Hard disk drive (HDD) / solid state disk (SSD)
RX2540 M6 Upgrade and Maintenance Manual 217