EasyManua.ls Logo

Siemens SIMATIC BATCH

Siemens SIMATIC BATCH
1158 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Setting up the equipment module with SFC types (Page 155)
Type description of the process cell (Page 211)
7.1 Basic engineering for PCS 7
Configurations in the SIMATIC Manager
Steps in configuration for PCS 7 basic engineering
1. Set up a new project in the SIMATIC Manager
File > New or File > "New project" wizard
CPU: Read product information
Insert global declarations.
2. Configure AS
Insert hardware: Communication module
Set up AS network connections
Adapt local data.
Copy blocks from the SIMATIC BATCH block library to your user project.
Specify reserved areas for data blocks and functions in the CFC.
Adapt the plant hierarchy to the specific project.
Configure objects. Insert CFCs in the plant hierarchy folder, install and interconnect
blocks in the CFCs, insert SFCs / SFC types in the chart folder of the CPU, set the mode
in the SFC, set the category and the mode in the SFC type and install and configure
transitions and actions.
3. Configure the PCS 7 OS server and PCS 7 ES
Insert hardware: BATCH application and communication processor for Industrial
Ethernet
Project-specific: Assign computer and object names
PCS 7 OS: Set up network connection
NetPro: Set up the WinCC connection to the AS
Configure Station Configuration Editor
In the WinCC Explorer: Check the computer name.
Engineering
7.1 Basic engineering for PCS 7
SIMATIC BATCH V8.2
122 Operating Manual, 02/2016, A5E35958174-AA

Table of Contents

Related product manuals