10.4.6.6 Setting a recipe phase for "Continuous operation"
During creation of a recipe, a flag can be set for a recipe phase that is not self-completing so
that this recipe phase (equipment phase) is not completed.
● This is necessary when an equipment phase (for example, agitating) is required to continue
after recipe operations.
● A second application is the setting of different parameters for the equipment phase without
having to turn it off and on again (for example during a flying control strategy change).
Procedure in the BATCH Recipe Editor
1. Open the master recipe.
2. Select a recipe procedure element.
3. Select the "Properties" command in the shortcut menu (selected with a right-click).
Result: The "Properties of <step name>" dialog opens.
4. Select the "Continue" check box.
5. Confirm with "OK".
10.4.6.7 Setting the control strategy of a recipe phase
Recipe phases can be implemented with various control strategies (set of setpoints) that can
be used in the manual mode or in the automatic mode (recipe mode). The control strategies
are configured along with their parameters in the engineering system. In the recipe editor, the
control strategies defined in this way are available in plain language under the name of the
control strategy. During parameter assignment, only the parameters belonging to the selected
control strategy are displayed.
Procedure in the BATCH Recipe Editor
1. Open the master recipe.
2. Select a recipe procedure element.
3. Select the command "Properties" in the context menu.
Result: The"Properties of <batch name>" tab dialog box will be displayed.
4. Select the required control strategy of the recipe step in the "Control strategies" field.
Result: In the tabs "Input material", "Output material" and "Parameters", only the parameter
values belonging to the selected control strategy and thus the valid parameter for this recipe
step are displayed.
5. Confirm with "OK".
BATCH Recipe Editor
10.4 Creating recipes
SIMATIC BATCH V8.2
Operating Manual, 02/2016, A5E35958174-AA 569