Configuration of the transition conditions
The following describes how to configure transition conditions 14 and 25.
1. Open a master recipe released for editing in the Recipe Editor.
2. Double-click on Transition 14 in the simultaneous branch. Click "New" on the "Condition"
tab. Then click "Change".
3. In the Transition Wizard, select "RPE Status" for "Operand 1" and "Constant" for "Operand
2". Then click "Next".
4. Open the full structure of your recipe in the "Recipe element" navigation window and select
"AddWater_6", select the "Ext. Status" attribute and click "Next".
5. Click "Next".
6. Select the expanded status with the "Error" value from the list, click "Next" and then "Finish".
7. Close the properties dialog of the transition.
8. Double-click on Transition 25 in the simultaneous branch. Click "New" on the "Condition"
tab. Then click "Change".
9. In the Transition Wizard, select "RPE Status" for "Operand 1" and "Constant" for "Operand
2". Then click "Next".
10.Open the full structure of your recipe in the "Recipe element" navigation window and select
"AddWater_6", select the "Status" attribute and click "Next".
11.Click "Next".
12.Select the status with the "Completed" value from the list, click "Next" and then "Finish".
13.Close the properties dialog of the transition.
14.Save your master recipe and release it.
Result
You can observe the following reaction in process mode. In Transition 27 of the simultaneous
branch, there is a query asking if the "AddWater_6" recipe phase is in the error state. If it is,
an operator instruction is issued reporting the event, for example, and needs to be
acknowledged. If the "AddWater_6" recipe phase is not in the error state, automatic mode is
resumed with Transition 14 in the query as to whether or not the "AddWater_6" recipe phase
has completed.
10.4.6.11 Information on the ROP monitoring time
Setting the batch runtime
To achieve better planning of batches, you can change the runtime for recipe operations that
has been calculated by the system and overwrite it if necessary. The monitoring time is set by
you and generates a system message, if the current ROP runtime is exceeded.
BATCH Recipe Editor
10.4 Creating recipes
SIMATIC BATCH V8.2
574 Operating Manual, 02/2016, A5E35958174-AA

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIMATIC BATCH and is the answer not in the manual?

Siemens SIMATIC BATCH Specifications

General IconGeneral
BrandSiemens
ModelSIMATIC BATCH
CategoryControl Systems
LanguageEnglish

Related product manuals