Step 3
The interrupted recipe unit procedure can now be aborted and reset (commands: "Abort step"
and "Reset step").
Step 4
Right click on the recipe procedure in the control recipe and select "Object properties" from
the context menu. Open the "Allocation" tab in the "Object properties" dialog. Reallocate the
process cell.
Step 5
The new unit is allocated by starting the RUP. The breakpoint at the ROP1 blocks any additional
call.
BATCH Control Center
9.8 Batch control
SIMATIC BATCH V8.2
454 Operating Manual, 02/2016, A5E35958174-AA