If you power down both BATCH servers on a redundant system with a time lag, when
restarting the BATCH server you will have to firstly restart the server you powered down
last. If you don't do this, there is a risk of you losing batch measurements and messages
from the period of the time lag.
When starting and ending database synchronization between the master and standby
servers, the WinCC messages "Data synchronization started" and "Data synchronization
complete" are produced.
5HGXQGDQW
%$7&+VHUYHU
)DXOWWROHUDQW
UHSOLFDWLRQ
VROXWLRQ
'DWDEDVH
V\QFKURQLVDWLRQ
%$7&+
VHUYHU
%$7&+
VHUYHU
7HUPLQDOEXV
3ODQWEXV
Hardware requirements
Redundant BATCH servers always require an additional network adapter independent from
the terminal and plant bus. These network adapters can be of the same type.
The additional network adapters must be installed in your PCs (redundant BATCH server
pair) in free PCI slots.
Make sure that you read the information in the relevant SIMATIC PCS 7 documents,
especially the document
PCS 7 - PC Configuration and Authorization
.
Product introduction and installation
3.5 Possible configurations
SIMATIC BATCH V8.2
58 Operating Manual, 02/2016, A5E35958174-AA

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIMATIC BATCH and is the answer not in the manual?

Siemens SIMATIC BATCH Specifications

General IconGeneral
BrandSiemens
ModelSIMATIC BATCH
CategoryControl Systems
LanguageEnglish

Related product manuals