Detail Steps/Work Items
Key Items/References
(16)
Move the wedge lock to its locked position.
(17)
Squeeze in the locking latches to release
them.
Refer to Fig. 71 - 113.
(18)
Move the wedge lock into the housing until
it is flush with the housing.
Refer to Fig. 71 - 114.
(19)
Attach all the single wires and Roundit
together.
Use cable ties.
Refer to Fig. 71 - 115.
(20)
Apply the black tape (self-vulcanizing)
between connector housing and green
Roundit over the single wires.
Refer to Fig. 71 - 116.