DLP-503: Detailed Level Procedure 365-575-102
Page 4 of 10 Issue 8.0, July 2002
10. Remove cross-connect loopback(s) established in Step 5.
11. Replace optical loopbacks removed in Step 4.
Reference: DLP-500
12. At the CIT, select CONFIGURATION-Update and execute. This update is
needed because of possible incoming signal failures, error conditions, etc.,
from the previous loopbacks.
13. STOP! YOU HAVE COMPLETED THIS PROCEDURE.
Figure 1 – Example of Test Auto Turnup Report - Cross-Connect Wir-
ing Test (Service Line Only in a Point-to-Point Network)
Lucent Technologies FT-2000 96-11-07 08:30:45 EST
M Test-Auto:All: COMPLD
/* Test Auto Turnup Report - Cross-Connect Wiring Test
=============================================================
Line 1: ------------LS INTFC------------
1122334455667788
port ABABABABABABABAB
1 ggg-F-ggFggggg-g
2 ggg---ggFggggg-g
3 ggg-F-gggggggg-g
*/
;