EasyManua.ls Logo

Lucent Technologies FT-2000 OC-48 - Provisioning Reports

Lucent Technologies FT-2000 OC-48
1578 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance Description
Issue 8.0 July 2002
9-93
Provisioning Reports 9
Provisioning reports list the current state of all provisionable options in the
FT-2000 OC-48 Lightwave System. For more information, refer to the following
inputs in Volume I, Section 11, "Craft Interface Terminal Usage" within the
CONFIGURATION category:
Also refer to the following inputs in Volume I, Section 11, "Craft Interface Terminal
Usage" within the SECURITY category:
Also refer to the FAULT-Retrieve-State input in Volume I, Section 11, "Craft
Interface Terminal Usage."
Retrieve-Assignment-DCC Retrieve-Attribute-Alarm
Retrieve-Attribute-Control Retrieve-Attribute-Environment
Retrieve-Circuit-STS1 Retrieve-Crossconnection-All
Retrieve-Crossconnection-
TIRKS
Retrieve-Date Retrieve-EC1
Retrieve-Equipment Retrieve-Low Speed
Retrieve-Map-Neighbor Retrieve-Map-Network
Retrieve-Map-Ring
Retrieve-OC12 Retrieve-OC3
Retrieve-OC48 Retrieve-Path-Trace
Retrieve-Protection-Line Retrieve-Protection-Low Speed
Retrieve-Protection-STS1 Retrieve-Synchronization
Retrieve-T3 Retrieve-Timeslot-STS1
Retrieve-ULSDCC-L3 Retrieve-ULSDCC-L4
Retrieve-Security-Network Element
Retrieve-Security-Port
Retrieve-Login
Retrieve-Network Element

Table of Contents