EasyManua.ls Logo

Lucent Technologies FT-2000 OC-48 - Page 457

Lucent Technologies FT-2000 OC-48
1578 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Administration and Provisioning
Issue 8.0 July 2002
8-53
At node 2, a 1-way drop cross-connection is entered by specifying:
Source (tributary)
Source line (line 1W)
Source STS-3 tributary (tributary 6)
Source STS-1 tributary (tributary 1)
Source node TID (node 0 TID)
Destination (STS-1 port)
Destination low-speed interface slot* (slot 5A)
Destination low-speed port (1).
At node 2, a 2-way add/drop cross-connection is entered by specifying:
Source (STS-1 port)
Source low-speed interface slot* (slot 2A)
Source low-speed port (3)
Destination line (line 1E)
Destination STS-3 tributary (tributary 5)
Destination STS-1 tributary (tributary 2)
Destination node TID (node 3 TID).
The same 2-way add/drop cross-connection may also be entered by
specifying:
Source (tributary)
Source line (line 1E)
Source STS-3 tributary (tributary 5)
Source STS-1 tributary (tributary 2)
Source node TID (node 3 TID)
Destination (STS-1 port)
Destination low-speed interface slot* (slot 2A)
Destination low-speed port (3).

Table of Contents